We Respect Our Environment

Power Plant


The establishment of power plant project was directed to provide Manaseer Cement and Mining Co. with complete electricity, aims to have an economical and efcient alternative to electricity purchase from the national network, with reference to the consequent of high nancial cost. The power plant is designed to operate steam cycle, coal fuel and/or petroleum coke, (the possibility of mixing certain proportions of other burnable materials) using the latest technologies of Fluidized bed boiler, which deemed the rst of its kind in Jordan and in the region. It is worth pointing out that, the steam condensation system is adopted by using forced draft towers to conserve water resources according to the highest environmental standards, particularly the European standards through various equipment specialized in minimizing harmful emissions such as nitrogen oxides and sulfur, which deemed better than Jordan steam plants of Heavy fuel or high-sulfur diesel.

Established in

Established in

2016
Production commencement

Production commencement

2017
Production capacity

Production capacity

30  Megawatts

Stages of Production


Stage 1

Stage 1

Coal and/or petroleum coke crushing.

Stage 2

Stage 2

Mixing coal after the process of crushing it with specic quantities of limestone to reduce sulfur oxides emissions.

Stage 3

Stage 3

Providing the boiler with coal mixture to complete the burning process*

Stage 4

Stage 4

Turning the pure water in the pipes into superheated steam of high pressure and temperature (350 °C, 130 bar).

Stage 5

Stage 5

The steam is moved by the turbine which in turn moves the electric generator for the purpose of generating a magnetic eld apart from transforming it into electrical energy distributed to consumers through the company's networks. 

Stage 6

Stage 6

The reproduction cycle process is completed through "the condenser" which condenses steam into water to be re-pumped.